A Detailed Guide to Trade Rates in Melbourne for 2025
Your Comprehensive Resource for Melbourne Trade Rates Across Demolition, Construction and Finishing Works

A Detailed Guide to Trade Rates in Melbourne for 2025
In late 2024, Pekaj Group Pty Ltd. conducted a comprehensive survey of their extensive network of builders, subcontractors and suppliers to compile information on trade rates in Melbourne. The results, outlined below, serve as a helpful starting point for your next building project.
Please note that these rates are “indicative only” and subject to negotiation depending on the specifics of your job. The data has been collected from independent contractors not affiliated with volume builders or tied to long-term agreements.
The rates provided are figures based on feedback from our network. While they are primarily applicable to townhouse developments, they can also be referenced for larger single and double-storey homes.
For projects in regional areas, it’s recommended to add a minimum of 15% to the indicative rates listed below for similar works.



Volume building operates on a completely different system. Volume builders secure long-term agreements with subcontractors and suppliers, typically spanning 12 to 24 months. These contracts lock in pricing and availability, providing consistency and predictability.
They focus on building the same designs repeatedly. This repetition allows tradespeople to become highly efficient. Over time, many can complete these builds with minimal effort due to their familiarity with the process.
For example, a tiler working for a volume builder may tile the same bathroom layout hundreds of times. This reduces errors and speeds up installation, keeping costs low and timelines tight.
Volume building rates often differ significantly from one-off projects. In some cases, they can be 20–30% cheaper than the indicative figures provided in the table above.
We hope this information provides valuable insight as you plan your next project. If your team requires additional personalised support, Pekaj Group Pty Ltd. is here to assist with cost estimation, quantity surveying and cost management solutions.
Other insights
Accurate Estimating Services for Builders
Accurate estimating services are the key to keeping your construction project on track. Discover how professional estimating can save time, reduce cost and boost profit margins.
How to Professionally Perform a Tile Take-Off: A Comprehensive Guide for Builders and Tiling Companies
Master the art of tile estimating! Discover essential techniques, avoid costly mistakes and ensure seamless finishes for any project with our comprehensive tiling guide.
Contact us now to leverage our expertise in cost estimation and planning.
Let's build success together.
